Selection of Completed Projects
Commercial & Industrial
|
Education / Child Care
|
Recreation / Hospitality
|
Sports Clubs
|
Shopping Centres
|
Health & Aged Care
Commercial & Industrial
| Alzheimer's Resource Centre |
| Client: |
Alzheimers Association of Queensland |
Click for enlarged image |
Value at Completion:
|
$1.5 million |
Description:
|
Construction of a new Resource and Administration Centre and associated landscaping and carparking. |
Duration:
|
20 weeks |
Completion Date:
|
December 2011 |
Architect:
|
PDT Architects |
|
|
| >> back to top |
| 41-43 Murray Street |
| Client: |
Constellation Wines |
Click for enlarged image |
Value at Completion:
|
$2.5 million |
Description:
|
2 storey office building and warehouse |
Duration:
|
28 weeks |
Completion Date:
|
June 2008 |
Architect:
|
Cecatto Hall Architects |
|
|
| >> back to top |
| Endeavour Foundation Offices |
| Client: |
Anthony John Group Pty Ltd |
Click for enlarged image |
Value at Completion:
|
$3.6 million |
Description:
|
Construction of Corporate Offices |
Duration:
|
36 weeks |
Completion Date:
|
March 2006 |
Architect:
|
Ceccato Hall & Associates |
|
|
| >> back to top |
| Cerebral Palsy League - Head Office |
| Client: |
Cerebral Palsy League of Queensland |
Click for enlarged image |
Value at Completion:
|
$2.7 million |
Description:
|
Alterations to existing building, extension and refurbishment of corporate offices. |
Duration:
|
30 weeks |
Completion Date:
|
June 2005 |
Architect:
|
Arkhefield Architects |
|
|
| >> back to top |
| Canon Corporate Office |
| Client: |
Anthony John Group Pty Ltd |
Click for enlarged image |
Value at Completion:
|
$4.1 million |
Description:
|
The project involved the construction of a new building comprising of a warehouse plus office space with parking for 42 vehicles. |
Duration:
|
28 weeks |
Completion Date:
|
September 2004 |
Architect:
|
Ceccato Hall & Associates |
| Awards: |
|
The Australian Institute of Building Awards
Queensland Chapter
High Commendation Award
|
|
|
|
| >> back to top |
| National Archives of Australia - Brisbane |
| Client: |
National Archives of Australia |
Click for enlarged image |
Value at Completion:
|
$1.7 million |
Description:
|
Internal and external refurbishment. Alterations to buildings 2 and 3 including external car park and landscape works. |
Duration:
|
28 weeks |
Completion Date:
|
December 2003 |
Architect:
|
Brian Simpson & Associates, Architects |
|
|
| >> back to top |
| Queensland Cancer Fund Office |
| Client: |
Queensland Cancer Fund |
Click for enlarged image |
Value at Completion:
|
$2.2 million |
Description:
|
The project involved the alterations/extension to a single storey office, adding a floor and maintaining tenant occupation and access for the duration of the project including a new facade and entry works. |
Duration:
|
40 weeks |
Completion Date:
|
August 2003 |
Architect:
|
John M Morton Architects Pty Ltd |
|
|
| >> back to top |
| Hendra Warehouse / Office |
| Client: |
S & D Pekol Holdings Pty Ltd |
Click for enlarged image |
Value at Completion:
|
$918000 |
Description:
|
Construction of a tilt-up, post tension slab warehouse and office with parking for 10 cars in prestigious estate. |
Duration:
|
25 weeks |
Completion Date:
|
March 2003 |
Architect:
|
Ceccato Hall & Associates |
|
|
| >> back to top |
| Festa Residence & Offices |
| Client: |
Rocco & Michele Festa |
Click for enlarged image |
Value at Completion:
|
$913000 |
Description:
|
Convert Saddlery Building to Residence & Offices |
Duration:
|
18 weeks |
Completion Date:
|
April 2002 |
Architect:
|
Peddle Thorp Architects |
| Awards: |
|
Australian Institute of Building Awards National Award
High Commendation
|
|
|
|
| >> back to top |
| New Farm Powerhouse Arts Precinct |
| Client: |
Brisbane City Council |
Click for enlarged image |
Value at Completion:
|
$2 million |
Description:
|
Refurbishment of the heritage listed New Farm Powerhouse site to a modern performing arts complex. Converting the Turbine building using the existing building elements and structure with new modern finishes to create two new theatres, studios, dressing rooms, commercial office space and restaurants. |
Duration:
|
40 weeks |
Completion Date:
|
March 2000 |
Architect:
|
City Design Group |
|
|
| >> back to top |
Education / Child Care
| St Ita's School - Dutton Park - under construction 02/02/12 |
| Client: |
The Catholic Archdiocese of Brisbane |
Click for enlarged image |
Value at Completion:
|
$1 |
Description:
|
Demolition of existing Administration and Classroom Block. Construction of New Administration Block and GLAs, with alterations to the Pool Amenities area. |
Duration:
|
30 weeks |
Completion Date:
|
August 2012 |
Architect:
|
Briggs Jacuzzi Architects |
|
|
| >> back to top |
| Arethusa College - Spring Hill - currently under construction 02/02/12 |
| Client: |
The Shaftsbury Centre |
Click for enlarged image |
Value at Completion:
|
$4 |
Description:
|
Construction of a new College Building including Administration, Performing Arts, Classrooms and associated facilities. |
Duration:
|
25 weeks |
Completion Date:
|
June 2012 |
Architect:
|
Ceccato Hall Architects |
|
|
| >> back to top |
| Marymount College Arts & Technology Centre - currently under construction 02/02/2012 |
| Client: |
Burleigh Heads Catholic Parish |
Click for enlarged image |
Value at Completion:
|
$3 million |
Description:
|
Construction of a two storey Arts & Technology building with associated Administration and Amenities. |
Duration:
|
30 weeks |
Completion Date:
|
February 2012 |
Architect:
|
Bertoldi Architects |
|
|
| >> back to top |
| Genesis Christian College - Bray Park |
| Client: |
Genesis Christian College |
Click for enlarged image |
Value at Completion:
|
$2 million |
Description:
|
Construction of Two Storey Primary Classrooms, Offices, Amenities and associated works. |
Duration:
|
20 weeks |
Completion Date:
|
November 2011 |
Architect:
|
Bickerton Masters Architecture |
|
|
| >> back to top |
| ACGS Tennis Centre |
| Client: |
Anglican Church Grammar School |
Click for enlarged image |
Value at Completion:
|
$2 million |
Description:
|
Construction of two storey Tennis Centre Clubhouse, associated tennis court development and Landscaping. |
Duration:
|
20 weeks |
Completion Date:
|
July 2011 |
Architect:
|
Brand & Slater Architects |
|
|
| >> back to top |
| Mt. St Michaels College - New Science and Classrooms Centre |
| Client: |
Mt. St Michaels College |
Click for enlarged image |
Value at Completion:
|
$8 million |
Description:
|
Construction of New Science & Classrooms Centre, including Auditorium and Staff carparking level. Built in 2 stages with independant handover dates. external works include 2 tennis Courts and associated pathways and landscaping. |
Duration:
|
60 weeks |
Completion Date:
|
December 2010 |
Architect:
|
Bertoldi Architects |
|
|
| >> back to top |
| Parklands Christian College - New Primary Library and Science Building |
| Client: |
Parklands Christian College Ltd |
Click for enlarged image |
Value at Completion:
|
$3 million |
Description:
|
Construction of New Primary Library and Science Building, with connecting courtyards and associated Landscaping works. |
Duration:
|
35 weeks |
Completion Date:
|
December 2010 |
Architect:
|
Bickerton Masters Architecture |
|
|
| >> back to top |
| Marymount College Science & Resource Centre |
| Client: |
Burleigh Heads Catholic Parish |
Click for enlarged image |
Value at Completion:
|
$3 million |
Description:
|
Provide a new Science and Library Resource Centre building, and integrate with existing school through refurbishment of existing Block 10 Classroom building. |
Duration:
|
33 weeks |
Completion Date:
|
March 2010 |
Architect:
|
Bertoldi Architects |
|
|
| >> back to top |
| Parklands Christian College |
| Client: |
Parklands Christian College Ltd |
Click for enlarged image |
Value at Completion:
|
$1.2 million |
Description:
|
Construct 2 new Primary classroom blocks, Covered play structure, with associated carparking and access areas. |
Duration:
|
20 weeks |
Completion Date:
|
August 2009 |
Architect:
|
Bickerton Masters Architects |
|
|
| >> back to top |
| Churchie Prep School |
| Client: |
Anglican Church Grammar School |
Click for enlarged image |
Value at Completion:
|
$1.5 million |
Description:
|
New building and associated play areas to provide for the introduction of a preparation year at the college. |
Duration:
|
26 weeks |
Completion Date:
|
February 2007 |
Architect:
|
Brand & Slater Architects |
|
|
| >> back to top |
| Genesis College Library - Stage 10 |
| Client: |
Genesis College |
Click for enlarged image |
Value at Completion:
|
$1.7 million |
Description:
|
Construction of new Library Building |
Duration:
|
18 weeks |
Completion Date:
|
October 2006 |
Architect:
|
Bickerton Masters |
|
|
| >> back to top |
| Moreton Bay Boys College - Stage 3B |
| Client: |
Moreton Bay Boys College |
Click for enlarged image |
Value at Completion:
|
$2 million |
Description:
|
Two storey Classroom Block |
Duration:
|
18 weeks |
Completion Date:
|
February 2006 |
Architect:
|
Bickerton Masters Architects |
|
|
| >> back to top |
| Cannon Hill Anglican College - Stage 3 Arts Centre |
| Client: |
Cannon Hill Anglican College Pty Ltd |
Click for enlarged image |
Value at Completion:
|
$4 million |
Description:
|
Construction of Performing Arts Centre |
Duration:
|
45 weeks |
Completion Date:
|
December 2005 |
Architect:
|
Parups Waring Architects |
|
|
| >> back to top |
| Moreton Bay College Music Centre |
| Client: |
Moreton Bay College |
Click for enlarged image |
Value at Completion:
|
$6 million |
Description:
|
Music Centre with associated Rehearsal, Chamber Rooms, Studios with seating for 500 people. |
Duration:
|
45 weeks |
Completion Date:
|
September 2005 |
Architect:
|
Bickerton Masters Architects |
|
|
| >> back to top |
| Moreton Bay Boys College - Stage 3 |
| Client: |
Moreton Bay Boys College |
Click for enlarged image |
Value at Completion:
|
$1.6 million |
Description:
|
New two storey general learning block, alterations and refurbishment to existing two storey administration / amenities block, car park, access road and landscaping. |
Duration:
|
28 weeks |
Completion Date:
|
February 2005 |
Architect:
|
Bickerton Masters Architects |
|
|
| >> back to top |
| Genesis College - General Learning Area Blocks-Stage 8 |
| Client: |
Genesis College |
Click for enlarged image |
Value at Completion:
|
$1.1 million |
Description:
|
Stage 8 - School project consisting of 2 single storey general learning area buildings and extension/alterations to existing amenities block. |
Duration:
|
36 weeks |
Completion Date:
|
November 2004 |
Architect:
|
Bickerton Masters Architects |
|
|
| >> back to top |
| Creche & Kindergarten Centres |
| Client: |
Creche and Kindergarten Association |
Click for enlarged image |
Description:
|
New and existing building refurbishments and updates. Various values, durations and architects over the past 30 years. |
|
|
| >> back to top |
Recreation / Hospitality
| Spring Restaurant - Felix Street |
| Client: |
Hancock Family |
Click for enlarged image |
Value at Completion:
|
$1 |
Description:
|
Refurbishment of a Restaurant, Hospitality and Cooking School in Brisbane City. |
Duration:
|
20 weeks |
Completion Date:
|
December 2011 |
Architect:
|
Brand & Slater Architects |
|
|
| >> back to top |
| Stafford Hotel |
| Client: |
A.T. Hotel Management Pty Ltd |
Click for enlarged image |
Value at Completion:
|
$3.4 million |
Description:
|
Construction of hotel extension, remodelling of gaming lounge, outdoor smoking courtyard, and other alterations and refurbishment. |
Duration:
|
30 weeks |
Completion Date:
|
September 2006 |
Architect:
|
Dimitriou Architects & Interior Designers |
|
|
| >> back to top |
| Belgian Beer Cafe |
| Client: |
Michael O'Brien Catering |
Click for enlarged image |
Value at Completion:
|
$2.3 million |
Description:
|
Brisbane CBD, new building basement, beer garden, refurbishment of existing building to provide bar and kitchen areas on ground floor. Refurbish levels 1 and 2 for commercial offices. |
Duration:
|
22 weeks |
Completion Date:
|
December 2003 |
Architect:
|
Brand & Slater Architects Pty Ltd |
| Awards: |
|
Queensland Master Builders Association State Winner
|
|
The Australia Institute of Building Professional Excellence Award Queensland Chapter
|
|
|
|
| >> back to top |
| Kooroomba Vineyard, Mt Alford |
| Client: |
R & M Carroll |
Click for enlarged image |
Value at Completion:
|
$1.9 million |
Description:
|
Restaurant and cellar facility with feature stone walls and polished concrete floors. |
Completion Date:
|
March 2002 |
Architect:
|
Wilson Architects |
| Awards: |
|
Queensland Master Builders Association
- Project of the Year 2002
- State Winner
|
|
The Australian Institute of Building
Professional Excellence Award
|
|
|
|
| >> back to top |
| Laguna Quays Resort |
| Client: |
Laguna Quays Resort - Proserpine |
Click for enlarged image |
Value at Completion:
|
$6 million |
Description:
|
Hillside Terraces & Racquet Club |
Duration:
|
39 weeks |
Completion Date:
|
November 1992 |
Architect:
|
Phillips Cox Rainer Architects |
| Awards: |
|
The Australian Institute of Building
National Award
|
|
|
|
| >> back to top |
| First Choice Liquor Superstore and Liquorland Stores |
| Client: |
Coles Myer Liquor Group |
Click for enlarged image |
Description:
|
New and refurbished stores and retail tenancies. Various values at completion and durations. |
Architect:
|
Brand & Slater Architects, Mohyla Architects Interior Designers |
|
|
| >> back to top |
| McDonald's Restaurants |
| Client: |
McDonald's Australia Limited |
Click for enlarged image |
Description:
|
Cafe and restaurant refurbishments. Various values at completion and durations. |
Architect:
|
Hamilton Hayes Henderson Architects |
|
|
| >> back to top |
Sports Clubs
| Sunnybank Rugby Club |
| Client: |
Sunnybank Community Club |
Click for enlarged image |
Value at Completion:
|
$1 |
Description:
|
Refurbishment and Additions to the Rugby Club and facilities. |
Duration:
|
25 weeks |
Completion Date:
|
January 2012 |
Architect:
|
Brand & Slater Architects |
|
|
| >> back to top |
| Richlands Lions Sports Club |
| Client: |
Richlands Lions |
Click for enlarged image |
Value at Completion:
|
$2 |
Description:
|
Refurbishment of Gaming Lounge and Dining Room Areas. Including Amenities and Deck enclosure. |
Duration:
|
30 weeks |
Completion Date:
|
January 2012 |
Architect:
|
Con Cayas Architects |
|
|
| >> back to top |
| Sunnybank Sports Club |
| Client: |
Sunnybank Sports and Community Centre |
Click for enlarged image |
Value at Completion:
|
$5 million |
Description:
|
Refurbishment and additions to Club Entry, Bars, Dining and Kitchens. New work to both ends of the building, while maintaining operations of the club. |
Duration:
|
approx 35 weeks |
Completion Date:
|
January 2011 |
Architect:
|
Brand & Slater Architects |
|
|
| >> back to top |
| Caboolture Sports Club |
| Client: |
Caboolture Sports Club |
Click for enlarged image |
Value at Completion:
|
$6 million |
Description:
|
Additions and refurbishment of the club, whilst maintaining full operation. |
Duration:
|
40 weeks |
Completion Date:
|
November 2010 |
Architect:
|
Brand & Slater Architects |
|
|
| >> back to top |
| Redcliffe Leagues Club - Stage 1A |
| Client: |
Redcliffe District Rugby League Football Club Inc |
Click for enlarged image |
Value at Completion:
|
$1.2 million |
Description:
|
Construction of a two storey lounge and smoking deck extension, consisting of ground floor slab, 1st floor reinforced concrete slab and beams. The main feature of the works is the installation of three light well voids providing natural light to the enclosed lower level, while showcasing unique architectural style, using the latest low emission glass technology to avoid heat impact. |
Duration:
|
20 weeks |
Completion Date:
|
January 2007 |
Architect:
|
Brand and Slater Architects |
|
|
| >> back to top |
| Brother's Leagues Club - Cairns |
| Client: |
Brother's Rugby League Football Club (Cairns) Inc. |
Click for enlarged image |
Value at Completion:
|
$1000000 |
Description:
|
Refurbishment of existing Sporting Club. |
Duration:
|
12 weeks |
Completion Date:
|
June 2006 |
Architect:
|
Brand & Slater Architects Pty Ltd |
|
|
| >> back to top |
| Greenbank RSL - Gaming Room Extension, Bar & Lounge Refurbishment |
| Client: |
Greenbank RSL |
Click for enlarged image |
Value at Completion:
|
$5.2 million |
Description:
|
Construction of Gaming Room extensions, Smoking Deck extensions and Bar & Lounge Refurbishment. |
Duration:
|
36 weeks |
Completion Date:
|
June 2006 |
Architect:
|
Brand & Slater Architects Pty Ltd |
|
|
| >> back to top |
| Indooroopilly Golf Club Refurbishment |
| Client: |
Indooroopilly Golf Club |
Click for enlarged image |
Value at Completion:
|
$2.2 million |
Description:
|
Alterations and extensions to Club House. |
Duration:
|
20 weeks |
Completion Date:
|
April 2006 |
Architect:
|
Brand & Slater Architects Pty Ltd |
|
|
| >> back to top |
| Parklands Gold Coast - Bar Refurbishments |
| Client: |
Parklands Trust |
Click for enlarged image |
Value at Completion:
|
$1000000 |
Description:
|
Refurbish Venue Bars |
Duration:
|
22 weeks |
Completion Date:
|
December 2005 |
Architect:
|
Mohyla Architects |
|
|
| >> back to top |
Shopping Centres
| Eastside Village - Stage 2 |
| Client: |
D & K Burke |
Click for enlarged image |
Value at Completion:
|
$1.5 million |
Description:
|
Extensions to the existing Eastside Village Shopping Centre with a new carparking level below.
Provide a new Medical Centre & Retail Tenancies. |
Duration:
|
25 weeks |
Completion Date:
|
October 2011 |
Architect:
|
Thomson Adsett Architects |
|
|
| >> back to top |
| Gumdale Shopping Centre - Stage 1 |
| Client: |
D & K Burke |
Click for enlarged image |
Value at Completion:
|
$3.3 million |
Description:
|
Single storey Retail Development |
Duration:
|
28 weeks |
Completion Date:
|
January 2006 |
Architect:
|
Thompson Adsett Architects |
|
|
| >> back to top |
| Southgate Shopping Complex |
| Client: |
Anthony John Group Pty Ltd |
Click for enlarged image |
Value at Completion:
|
$3 million |
Description:
|
The project involved the construction of retail shops and corporate offices. |
Duration:
|
36 weeks |
Completion Date:
|
January 2005 |
Architect:
|
Ceccato Hall & Associates |
|
|
| >> back to top |
Health & Aged Care
| Canossa Hospital -Dementia Building |
| Client: |
Canossa Services |
Click for enlarged image |
Value at Completion:
|
$10 million |
Description:
|
Provide a new 3 storey Dementia Wing to the existing Hospital. |
Duration:
|
40 weeks |
Completion Date:
|
November 2010 |
Architect:
|
Thomson Adsett Architects |
|
|
| >> back to top |
| Berlasco Court Aged Care Facility |
| Client: |
Ethnic Communities Council Queensland |
Click for enlarged image |
Value at Completion:
|
$550000 |
Description:
|
Administration and common room extension |
Duration:
|
18 weeks |
Completion Date:
|
May 2004 |
Architect:
|
Hargraves Briggs Jacuzzi Architects Pty Ltd |
|
|
| >> back to top |
|